The goods the subject of the application (the goods) are:
Certain utility scale wind towers, whether or not tapered, and sections thereof (whether exported assembled or unassembled), and whether or not including an embed being a tower foundation section.
Wind turbines that have electrical power generation capacities equal to or in excess of 1.00 megawatt (MW) and with a minimum height of 50 metres measured from the base of the tower to the bottom of the nacelle (i.e., where the top of the tower and nacelle are joined) when fully assembled.
A wind tower section consists of, at a minimum, multiple steel plates rolled into cylindrical or conical shapes and welded together (or otherwise attached) to form a steel shell, regardless of coating, end-finish, painting, treatment or method of manufacture, and with or without flanges, doors, or internal or external components (e.g. flooring/decking, ladders, lifts, electrical junction boxes, electrical cabling, conduit, cable harness for nacelle generator, interior lighting, tool and storage lockers) attached to the wind tower section.
Further information on the goods, including exclusions, can be found in ADN below.
Case information | |||
---|---|---|---|
Applicant | Keppel Prince Engineering Pty Ltd | Tariff Classification |
7308.20.00 (stat code 03, 04) 7308.90.00 (stat code 52,53, 54, 55, 56, 63, 65) 8502.31.10 (stat code 31) |
Review Period | N/A | Injury Examination Period | N/A |
Contacts for this investigation |
Case Manager: Tel: (03) 8539 2554 |
Mailing address: | The Director - Investigations 3 Anti-Dumping Commission GPO Box 2013 Canberra ACT 2601 |
Key Dates | |||
---|---|---|---|
Initiation Date | 12 May 2023 | Initial submissions due | 19 June 2023 |
SEF* no later than | 16 November 2023 | SEF submissions due | 20 days after publication of SEF |
Final recommendation due no later than | 05 February 2024 | Minister's decision expected | Within 30 days of receiving the recommendation. The final report shall be published following the Minister's decision. |
**SEF - Statement of Essential Facts |
Questionnaires | ||
---|---|---|
Exporter | Questionnaire | |
* Lodgement of Exporter questionnaire is due by: 19 June 2023 |
Electronic Public Records
EPR number | Document type | Title | Date |
---|---|---|---|
17 | Notice - ADN | ||
16 | Report | ||
15 | Note for File | ||
14 | Submission | ||
13 | Submission | ||
12 | Submission | ||
11 | Report | ||
10 | Notice - ADN | ||
9 | Submission | ||
8 | Submission | ||
7 | Verification Report | ||
6 | Submission | ||
5 | Notice - ADN | ||
4 | Questionnaire | ||
3 | Questionnaire | ||
2 | Notice - ADN | ||
1 | Application |