The Australian Government is now operating in line with Caretaker Conventions, pending the outcome of the 2025 federal election.
The goods the subject of the application (the goods) are:
Aluminium extrusions that:
- are produced by an extrusion process;
- are of alloys having metallic elements falling within the alloy designations published by The Aluminium Association commencing with 1, 2, 3, 5, 6 or 7 (or proprietary or other certifying body equivalents);
- have finishes being:
- as extruded (mill);
- mechanically worked;
- anodized; or
- painted or otherwise coated, whether or not worked;
- have a wall thickness or diameter greater than 0.5 mm;
- have a maximum weight per metre of 27 kilograms; and
- have a profile or cross-section fitting within a circle having a diameter of 421 mm
Further information
The goods under consideration include aluminium extrusion products that have been further processed or fabricated to a limited extent, after aluminum has been extruded through a die. For example, aluminium extrusion products that have been painted, anodised, or otherwise coated, or worked (e.g. precision cut, machined, punched, or drilled) fall within the scope of the goods.
The goods under consideration do not extend to intermediate or finished product that are processed or fabricated to such an extent that they no longer possess the nature and physical characteristics of an aluminum extrusion but have become a different product.
Further information on the goods can be found in the initiation ADN 2025/030.
Case information | |||
---|---|---|---|
Applicant | Xiamen Hopergy Photovoltaic Technology Co.,Ltd | Tariff Classification | 7604.10.00 (statistical code 06) 7604.21.00 (statistical code 07,08) 7604.29.00 (statistical code 09,10) 7608.10.00 (statistical code 09) 7608.20.00 (statistical code 10) 7610.10.00 (statistical code 12) 7610.90.00 (statistical code 13) |
Contacts for this investigation |
Case Manager: P: TBA |
Mailing address: | The Director - Investigations 4 Anti-Dumping Commission GPO Box 2013 Canberra ACT 2601 |
Key Dates | |||
---|---|---|---|
Initiation Date | 11 April 2025 | Initial submissions due | 12 May 2024 |
Review period | 1 April 2024 to 31 March 2025 | Injury Examination Period | N/A |
Final recommendation due no later than | 14 July 2025 | Minister's decision expected | Within 30 days of receiving the recommendation |
*SEF - Statement of Essential Facts |