The goods the subject of the application (the goods) are:

Certain utility scale wind towers, whether or not tapered, and sections thereof (whether exported assembled or unassembled), and whether or not including an embed being a tower foundation section.

Wind turbines that have electrical power generation capacities equal to or in excess of 1.00 megawatt (MW) and with a minimum height of 50 metres measured from the base of the tower to the bottom of the nacelle (i.e. where the top of the tower and nacelle are joined) when fully assembled.

A wind tower section consists of, at a minimum, multiple steel plates rolled into cylindrical or conical shapes and welded together (or otherwise attached) to form a steel shell, regardless of coating, end-finish, painting, treatment or method of manufacture, and with or without flanges, doors, or internal or external components (e.g., flooring/decking, ladders, lifts, electrical junction boxes, electrical cabling, conduit, cable harness for nacelle generator, interior lighting, tool and storage lockers) attached to the wind tower section.

Further information on the goods, including exclusions, can be found in ADN below.

Case information
Applicant Keppel Prince Engineering Pty Ltd Tariff Classification

7308.20.00 (stat code 03, 04)

7308.90.00 (stat code 52, 53, 54, 55, 56, 63, 65)

8502.31.10 (stat code 31)

Review Period 01 July 2021 to 31 December 2022 Injury Examination Period N/A
Contacts for this investigation Case Manager: 
E: investigations3@adcommission.gov.au
Mailing address: The Director - Investigations
Anti-Dumping Commission
GPO Box 2013
Canberra ACT 2601

 

Key Dates
Initiation Date 27 February 2023 Initial submissions due 5 April 2023
PAD* earliest date N/A If a PAD is not made, a Day 60 Status Report will be published on this day
Application/Submission to extend review to include revocation N/A
Proposals to modify the proposed MCC structure due no later than N/A
SEF* no later than 20 May 2024 SEF submissions due 20 days after publication of SEF
Final recommendation due no later than 22 July 2024 Minister's decision expected Within 30 days of receiving the recommendation. The final report shall be published following the Minister's decision.

*PAD - Preliminary Affirmative Determination

**SEF - Statement of Essential Facts  

 

Questionnaires
Exporter Questionnaire Questionnaire Spreadsheet
Government of China   Questionnaire  
* Lodgement of Exporter questionnaire is due by: 05 April 2023
* Lodgement of Importer questionnaire is due by: NA

Electronic Public Records

EPR number Document type Title Date
27 Notice - ADN
26 Notice - ADN
25 Submission
24 Submission
23 Notice - ADN
22 Verification Report
21 File Note
20 File Note
19 Notice - ADN
18 Submission
17 Verification Report
16 Submission
15 Submission
14 Submission
13 Submission
12 Briefing
11 Notice - ADN
10 Submission
9 Application
8 Notice - ADN
7 Questionnaire
6 Questionnaire
5 Questionnaire
4 Submission
3 Report
2 Application
1 Notice - ADN