The goods the subject of the application (the goods) are:
Clear Laminate Glass (CLG) in nominal thicknesses of 6 to 12 millimetres (mm).
The following table details the tolerances for each of the thicknesses in the nominated range:
Nominal Thickness (mm) |
Acceptable Tolerances (mm) |
|
Minimum |
Maximum |
|
6 |
5.6 |
6.4 |
8 |
7.6 |
8.4 |
10 |
9.6 |
10.4 |
12 |
11.6 |
12.4 |
The goods the subject of the application have the following characteristics:
- are often referred to as architectural laminate glass or annealed laminate glass
- contain clear substrate glass (coatings may or may not be present on the surface of the glass)
- are manufactured in flat sheets of any size
- are rectangular or square in shape
- contain two sheets of annealed glass (the two glass sheets being the same or of different thickness)
- contain an interlayer, which can be made up of one or multiple sheets of interlayer of varying thickness, colour and opacity
- can be packaged as lose packs or in end-caps.
Glass with the following characteristics is not the goods the subject of the application:
- laminated glass defined as custom/speciality1
- laminated glass that is wired
- laminated glass that is bent, edge-worked, engraved, drilled, enamelled, or otherwise worked
- aminated glass that is framed or fitted with other materials
- laminated glass that is toughened (tempered)
- laminated glass that is acid etched
- laminated glass made of low iron.
Further information on the goods, including exclusions, can be found in ADN 2024/037.
Case information |
|||
Applicant |
Oceania Glass Pty Ltd |
Tariff Classification |
7007.29.00 (statistical codes 18 and 15) |
Review Period |
1 April 2023 to 31 March 2024 |
Injury Examination Period |
From 1 April 2020 |
Contacts for this investigation |
Case Manager: Tel: (03) 8539 2562 |
Mailing address: |
The Director - Investigations 4 |
Key Dates |
|||
Initiation Date |
25 June 2024 |
Initial submissions due |
1 August 2024 |
PAD* earliest date |
26 August 2024 |
If a PAD is not made, a Day 60 Status Report will be published on this day |
|
Proposals to modify the proposed MCC structure due no later than |
1 August 2024 |
||
SEF* no later than |
14 October 2024 |
SEF submissions due |
20 days after publication of SEF |
Final recommendation due no later than |
27 November 2024 |
Minister's decision expected |
Within 30 days of receiving the recommendation |
*PAD - Preliminary Affirmative Determination **SEF - Statement of Essential Facts
|
Questionnaires |
||
Exporter |
||
Importer |
||
* Lodgement of Exporter questionnaire is due by: 1 August 2024 |
||
* Lodgement of Importer questionnaire is due by: Part A: 2 July 2024 Part B, C: 16 July 2024 and Part D & E: 23 July 2024 |
Electronic Public Records
EPR number | Document type | Title | Date |
---|---|---|---|
11 | Application | ||
10 | Notice - ADN | ||
9 | Submission | ||
8 | Submission | ||
7 | Submission | ||
6 | Submission | ||
5 | Note for File | ||
4 | Submission | ||
3 | Notice - ADN | ||
2 | Report | ||
1 | Application |